△ FOOY / ARCHIVE
Fooy / Historical record

Integration Phase · November 5

The earlier technical prototyping roadmap before the citizen resource focus.

Historical source, edited for subject separation. This record is adapted from a saved public Fooy page. Its earlier navigation, media and separately managed research passages were removed. It is not an active standard or site-specific engineering guidance.
BUILD RECORD / NOVEMBER 5, 2026 / PUBLIC

Phase 2: Connect the Technology

Development priority: Move Fooy's public technology tracks toward a single practical household test platform. This update records scope and next milestones. It is not a claim of deployed integrations.

What exists to build upon

Current milestones

  1. Acquire and configure suitable local Library hardware and storage.
  2. Establish a local-network Sprovik service path with clear cloud/offline boundaries.
  3. Connect PAD to the same Library services, testing responsiveness and data handling.
  4. Prototype spatial mapping and device coordination in a household environment.
  5. Document limitations, safety controls, repeatability, and costs before expansion.

Home design and resident capability

The residential model proposes lots from ½ to 100 acres with household-scale power generation, rainwater collection, gardening and practical fabrication using CNC and 3D printing. Local AI-guided education is intended to raise practical skills across the community and reduce everyday dependence on distant providers and routine government assistance. All lot sizes and systems remain proposed until feasibility and tests are complete. Read the homestead and skills design brief ↗

Beyond the first integrated system

Once household-scale components are testable, Fooy can refine practical requirements for resilient homes, energy and water integration, learning and repair spaces, and eventually a small community demonstration. A twenty-home community is an aspiration, not a funded or approved development.

Evidence standard

Design, prototype, test and verified outcome are separate statuses. Dates on this site are public document revisions, not promised completion deadlines. Household equipment, automated security, infrastructure and emergency functions must not be represented as field-validated until they have been tested.

Browse the original Fooy community-era site ↗ · Current homepage ↗

Published-source package prepared November 5, 2026. Live deployment requires verification.

All archived development records →